To start at the beginning of my bathroom remodel, go to Master Bath Renovation, Part One.
We have a working throne room. Yay! The only thing left to do in there is to install some shelves above the toilet. We installed and grouted the tile, then husband installed a new American Standard Acti-clean Vortex, self-cleaning toilet, the handheld bidet with hot and cold water, and the toilet paper holder. Instead of drilling through the tile to install the toilet paper holder, we planned the place where it would be installed beforehand and just left a tile out. It worked out perfectly.
I found this neat little light switch cover on Etsy.
We've gotten most of the walls tiled, but are still waiting on the countertop installation (which is scheduled for tomorrow) so we can tile the backsplash.
I found this old china cabinet to use for storage. I plan to paint this eventually. Don't be hatin' me for painting an antique. This is directly across from the stained wood vanities and all that dark wood is too overwhelming for that space.
We're still procrastinating on the shower and considering hiring someone to do it.
Go to Part Ten to continue.