All of the cabinets are installed, shimmed and leveled. It took a lot of shims because the floors in this old house are pretty wacky. All of the beadboard is painted and installed, too. There's quite a bit of trim work that still has to be done, but at least we're seeing a kitchen instead of a big empty space.
After the plumbing is done (hopefully by tomorrow), we can start on the island concrete countertop. While that is curing, we can finish up all the trim stuff that needs to be done.
It's exciting to see it all coming together!
1 comment:
Very nice. It must be very satisfying to see the finished product.
Post a Comment